top of page

Project Type: Design Build

Contractor Scope:

  • Structural Steel Design Build

  • Bridge Crane and Hoist Design Build

  • Structural Steel Fabrication & Erection

  • Bridge Crane and Hoist Installation

Professional Role:

  • Senior Project Manager

  • BIM Coordinator

Total Project Value: $52MM

Scope Value: $3.8MM (GMP)

Owner: The Ohio State University

Designers:

  • Champlin Architecture

  • Lupton Rausch 

  • Shelly Metz Baumann Hawk 

  • RMP Engineering

  • Arup

GC/GM: Whiting Turner


Ohio’s Construction Reform Law (OCR), passed in 2011, made this project possible as a Design Build (GMP) project. Utilizing fully integrated BIM technologies to coordinate both the base contract, which included capacity for 15,000 tons of chilled water, the design team was also challenged with incorporating the design components for the future installation of an additional 15,000 tons of chilled water capacity. Steel Structures of Ohio worked closely with the design team to reduce the building steel tonnage, while also incorporating and providing bridge cranes and hoists used to service the building’s heavy equipment.

 

COLUMBUS, OH

SOUTH CAMPUS CENTRAL CHILLER PLANT